{"id":440,"date":"2019-04-17T17:09:36","date_gmt":"2019-04-17T15:09:36","guid":{"rendered":"https:\/\/idec-grandsud.com\/blog\/sequabat-has-started-work-on-the-second-phase-of-a-warehouse-in-castelnau-destretefonds-haute-garonne\/"},"modified":"2023-03-22T19:37:20","modified_gmt":"2023-03-22T18:37:20","slug":"sequabat-has-started-work-on-the-second-phase-of-a-warehouse-in-castelnau-destretefonds-haute-garonne","status":"publish","type":"post","link":"https:\/\/idec-grandsud.com\/en\/sequabat-has-started-work-on-the-second-phase-of-a-warehouse-in-castelnau-destretefonds-haute-garonne\/","title":{"rendered":"SEQUABAT has started work on the second phase of a warehouse in Castelnau-d\u2019Estretefonds (Haute Garonne)"},"content":{"rendered":"
SEQUABAT, the subsidiary of the IDEC GROUP that specialises in the design and construction of turnkey projects involving business and residential property, has just started work on the second phase of a logistics platform for the 3R Group. This 10,450 m\u00b2 phase marks the continuation of a project launched last year and for which the first part will be handed over before the summer. <\/strong><\/p>\n","protected":false},"excerpt":{"rendered":" SEQUABAT, the subsidiary of the IDEC GROUP that specialises in the design and construction of turnkey projects involving business and residential property, has just started work on the second phase…<\/p>\n","protected":false},"author":1,"featured_media":284,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[11,61],"tags":[],"class_list":["post-440","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualites","category-news"],"yoast_head":"\n